Half a year –A significant financial saving is transportation, which takes around one month by train or ship. So if you are limited by budget, early planning is a significant savings. So production, production communication and logistics will take around 3 months in total if you choose this long-term strategy.
The production itself is usually within 10 days. Another 9 days is the actual air freight or volume aggregation for shipping. For 95% of orders, lead time is 19 calendar days from production confirmation, pre-production preview approval and deposit payment. Very often the communication - approval - internal processes time is longer than the actual production time.
Volume discounts in production and transport play a significant role. 28 m3 is the usable volume of a small shipping container. This is also the economic shipping volume - then its multiples (a large shipping container is two small ones).
Unless otherwise agreed, the deposit amount for custom production is 50% of the total order price.
We can arrange for the shipping and customs process of non-custom products together with the custom production ordered from our company.
The minimum quantity to be produced is very often based on the type of product. As a general rule - the fewer the pieces the higher the price. Some products we are able to produce from as little as 100 pieces - for example silicone wristbands, fans, microfiber cloths, textile key rings, 3D epoxy stickers, carabiners.
The minimum order price is 5.000,- CZK.
Production preparation means a process aimed at ensuring all the steps to start a flawless custom production.
Yes, this is not a problem. It is possible. Prototyping is a demanding process and is therefore charged at CZK 5.000,-/piece/design + the cost of the mould, if necessary for the production of such a product.